Just as an update, the slabs are almost all poured with the exception of some areas around the lifts and the connection bridge to the main hospital, the steel structure is all up, the exterior façade is going on and there is even some steel stud internal partitioning being built. Services are all being installed after being designed in 3D on Revit as is the rest of the exterior and interior of the building. Fun fact: The link bridge to the main hospital is 40m long.